PROJECTS

Armadale Line Upgrade Alliance - Drainage

CLIENT

Armadale Line Upgrade Alliance

OWNER

Public Transport Authority

LOCATION

Armadale, Western Australia

PROJECT SUMMARY

Perth’s first major elevated rail line, removing six level crossing across the Armadale Line replaced with elevated rail and stations. 4km of elevated rail has been constructed along with five new elevated stations, freeing up approximately six hectares of versatile public space.

OUR ROLE
  • Installation of the new and improved drainage network throughout the rail corridor and surrounding areas

  • New stormwater drainage

  • Sub Soil Drainage

  • Box Culvert

  • Drainage Pits / Lids

  • Dry Vac excavation working closely around other services to install drainage

  • Temporary/diversion drainage works to open up work front

  • Install of MCR / Electrical containment works for the main rail alignment and footpath lighting under the viaducts

  • Supply qualified high-level labour throughout the project duration to complete the project

  • Provide relevant plant and machinery working – mobilising each piece of equipment