top of page
PROJECTS
Kumarina River Bridge Replacement
CLIENT
BMD Construction
OWNER
Main Roads Western Australia
LOCATION
Pilbara Region – South of Newman

PROJECT SUMMARY
BMD engaged CATS for the construction of two bridges on the Great Northern Highway. Our main scope of works was the construction of the concrete insitu package for both bridges.
CATS had previously completed a similar package of work, for the client, on the Fortescue River Bridge which highlighted our ability to mobilise quickly and complete the SOW with ease in remote areas of WA.
OUR ROLE
Detailed earthworks for concrete structures and structural backfill.
Assistance with local drainage and drainage channels.
Supply and form up formwork, tie reinforced steel bar & pour concrete to the following insitu concrete structures.



bottom of page